Career record · Eurosoft Tech

Two years of
software delivery.

A project-by-project overview of Ashfaq Ali Zardari's work as a Sr. Software Engineer, drawn from the supplied worksheet and task records.

Employment worksheet31 Aug 2023 – 22 Apr 2025
Recorded work items582 tasks
Explicit task dates549 entries

This is professional experience completed at Eurosoft Tech, not work delivered by Ashfaq Ali Zardari Store LLP. The worksheet contains 582 task entries, of which 549 have a date in the extracted source; the original PDFs are linked below for the complete record.

Featured product work

k0nneCT Pay
· two coordinated systems

A payment and account-management platform developed with .NET 8. The API and browser-based admin panel were separate projects, with authorization rules applied to both API access and the interface.

System 01
ASP.NET Core Web API · .NET 8

Supplier & payment API

Built a Web API documented with Swagger/OpenAPI to connect suppliers and clients and support account, booking, and payment workflows. The API covered supplier records, client assignment, booking status, user management, master and Express accounts, subaccounts, terminal devices, transactions, card management, and fund transfers.

  • JWT bearer authentication with role- and permission-based authorization.
  • API permissions enforced independently of what navigation items are shown in the admin interface.
  • Stripe-connected test and live account flows, transaction records, and payment operations.
  • Connected to 3+ Microsoft SQL Server databases, with API request and payment transaction logs routed to a separate database, as described in the supplied project brief.
System 02
ASP.NET Core MVC · .NET 8

k0nneCT Pay admin panel

Developed the administrative UI for managing user types, client accounts, suppliers, and payment operations. Account creation and navigation were permission-aware, with menu sections and child items assigned to user access profiles.

  • Supported supplier, client, and client-user workflows, including main accounts, subaccounts, and terminal devices.
  • Enabled authorized clients to review transactions by main account, subaccount, and terminal, and export reports as PDF, Excel, or CSV.
  • Provided account, user, and transaction administration across test and live Stripe-connected environments.

Security terminology: RSA uses public/private key pairs and can sign JWTs; AES is symmetric encryption and does not have public/private keys or a 4096-bit key size. Passwords should be stored as one-way adaptive hashes, not encrypted. The source worksheet confirms JWT-key authentication; verify deployed key sizes and data-encryption details against the production configuration before publishing those specifics.

Business operations

Sweet
Enterprises

Property management · .NET

Reporting that
keeps the books clear.

Maintained a .NET web admin panel for property-management reports, finance and accounts workflows, and ledger records.

Work timeline

Dated work,
from the source log.

Dates below are shown where they appear in the worksheet. Project totals and ranges are counts of source rows, not performance metrics.

31 August 2023 · Employment start

First day · Web Dispatch introduction

The worksheet identifies this as the first day. Its opening k0nneCT entries cover .NET 8 MVC and API setup, Swagger, authentication and authorization, user management, supplier and client workflows, account types, transactions, and card management; the source does not separately date each opening task.

January 2025 · k0nneCT & 2NiceShareRide

Dated entries begin 1 January

Worked on pagination for Express Logs in the k0nneCT client and API, converted the 2NiceShareRide UI to MVC, and added driver-profile and document API work.

February 2025 · Web-booking client projects

Dated project entries across February

Task records include E&H Reliable Airport Taxi, HollandTaxiAppBV, and Emara Technologies, alongside booking and web-booker maintenance.

17–18 March 2025 · God Speed Transportation

15 recorded tasks · 17–18 March

Delivered dynamic contact and fleet pages, vehicle data, booking flows, driver recruitment pages, SMTP configuration, and website testing.

19 March–22 April 2025 · 2Nice Trip

28 recorded tasks · final dated work 22 April

Added admin web settings and endpoints, booking validation, mobile address-search fixes, driver-profile image updates, and vehicle-image features.

8–12 April 2025 · Order Tiger (Uber Direct API)

18 recorded tasks · 8–12 April

Created .NET 8 Web API delivery-quote, create-delivery, and cancellation endpoints; integrated token authentication and RSA-based JWT signing, and documented endpoint requests and responses.

Project streams

Work represented
in the worksheet.

Task counts reflect rows attributed to each project in the source PDF. Date ranges use only explicit dates in that source.

183

2NiceShareRide

2 Jan–18 Mar 2025

84

k0nneCT Client

1 Jan–18 Apr 2025

30

k0nneCT API

1 Jan–5 Mar 2025

29

E&H Reliable Airport Taxi

12–28 Feb 2025

28

2Nice Trip 5877

19 Mar–22 Apr 2025

26

HollandTaxiAppBV

29 Jan–5 Feb 2025

24

Emara Technologies

31 Jan–5 Feb 2025

18

Order Tiger · Uber Direct API

8–12 Apr 2025

17

Amerc Taxi Website

23–29 Jan 2025

16

DesignatedDriver 5864

7–10 Mar 2025

Additional integrations

More systems
connected in the work.

01

NACD student and admin portals

Created .NET Core API and portal projects, added JWT authentication and authorization, and developed modules for student registration and profiles, quizzes, and document review/approval. The source also records English-to-Arabic language conversion work.

.NET Core · Web API · Student systems · Localization
02

Transport and dispatch integrations

Integrated a VTC SOAP API and built a desktop certificate-upload utility. Related records include Web Dispatch functionality and driver, fleet, booking, and certificate workflows across transport projects.

SOAP · Desktop utility · Booking systems · Dispatch
03

Messaging and booking automation

Worked on Dinstar SMS integration for newer devices, a WhatsApp Business messaging API, and a Twilio SMS booking bot. These entries are included in the worksheet; individual dates are not populated on every source row.

Dinstar SMS · WhatsApp Business API · Twilio

Technical skills

Tools used
to ship the work.

Across the recorded period, the work grew from .NET MVC and Web API setup into payment and account workflows, multi-database transaction logging, third-party API integrations, and production support across booking and administration products.

.NET 8ASP.NET Core MVCASP.NET Core Web APIC#Microsoft SQL ServerEntity FrameworkSwagger / OpenAPIJWT authenticationRole-based access controlStripe integrationsREST APIsWeb Forms / ASPX

Source documents

Original records
and next additions.

Open the source PDFs in your browser or download a copy. Keep the originals alongside the portfolio page for transparent reference.

31 Aug 2023 – 22 Apr 2025 · 38 pages

Eurosoft Tech two-year worksheet

Project, product, and task log for the employment period. Includes the full task descriptions and dates as supplied.

4–5 Aug 2025 · 1 page

Live-source task list

26 tasks assigned to Ashfaq Ali Zardari, including the task IDs, created/completed dates, project names, and task descriptions. These records are dated after the worksheet's 22 April 2025 end date and are kept separate from that employment timeline.

Additional employment records

Appreciation certificate, offer letter, confirmation or promotion letter, and dated email records have not been supplied yet. Add each approved file under docs/ and link it here with its document date when ready.

Awaiting files